Electrical Requirements for Mining Containers in North America: What Buyers Must Check Before Energizing

Most mining container problems do not start with a failed ASIC. They start with a question from the electrician: “Where is the load schedule?” Or from the inspector: “What is the SCCR?” Or from the site owner: “Who approved this electrical assembly for operation here?” That is the moment a cheap container becomes expensive. North […]
How to Choose a Mining Container Supplier: 7 Things You Must Check Before Buying

Most buyers get burned not because they chose the wrong cooling technology. They get burned because they chose the wrong supplier. We have been manufacturing and deploying ASIC mining containers — air-cooled, liquid-cooled, and immersion — long enough to see exactly how these deals go wrong. A supplier quotes an attractive number. The buyer wires […]
